House construction cost estimator (PH)

Estimate the cost of building a house in the Philippines, with fees, contingency and a monthly plan.

Estimated total, without land

₱2,669,436 to ₱3,756,984

Middle estimate: ₱3,213,210

Construction

₱2,730,000

Design fees

₱191,100

Contingency

₱292,110

Permits and other

₱0

To pay in 24 months, send about ₱133,884 a month (from ₱111,227 to ₱156,541).

Costs are raised by 5.0% for the wait before you build.

Checked November 5, 2026. Cost per square meter (₱20,000 to ₱26,000 economy, ₱27,000 to ₱38,000 standard, ₱38,000 to ₱55,000 mid to high, ₱55,000 and up high-end) comes from a Philippine builder’s guide dated July 2026, and the fee and contingency ranges (design and engineering 5 to 10%, contingency 10 to 15%) come from a bank-lender guide updated in October 2026. These are builder-quoted ranges and not government figures. They cover the building itself, and exclude land, furniture, and appliances. Prices differ a lot by province, soil, design, and finish, so treat the result as a starting budget and ask two or three licensed contractors for written quotes with a bill of materials.

Budget your dream house before you start

Enter the floor area and finish level to get a cost range using 2026 builder-reported prices per square meter: ₱20,000 to ₱26,000 economy, ₱27,000 to ₱38,000 standard, and ₱38,000 to ₱55,000 mid to high. The tool adds design fees, a contingency, permits, utility connections, and land preparation, and raises costs for the time you wait before building. It then shows how much to send each month to pay for it.

Land and finishing are separate

These ranges cover the building only. Land, furniture, and appliances are extra. Costs vary a lot by province, soil, and design, so ask two or three licensed contractors for written quotes. If you plan to borrow, see the Pag-IBIG housing loan calculator.

Questions

Where do the prices come from?
From a Philippine builder’s guide dated July 2026, with fee and contingency ranges from a bank-lender guide updated in October 2026. They are not government figures.
Why add a contingency?
Prices and plans change during a build. Guides suggest 10 to 15% of the build cost.
Does the price include land?
No. It covers construction only.
Can I use my own price per square meter?
Yes. Enter it in the custom field, for example from a contractor’s quote.
How do I pay for it from abroad?
Many OFWs build in phases and send money monthly. The tool shows the monthly amount for the number of months you choose.